News update
  • 86 proposals from 14 groups to revive closed govt factories     |     
  • Trump Threatens to Declare Strait of Hormuz US Territory     |     
  • 7.7-Magnitude Earthquake Strikes Off Indonesia, Tsunami Alert     |     
  • Khaleda Zia: The Story of an Unyielding Political Leader     |     
  • Shipbreaking before releasing toxic gas kills 9 in Sitakunda     |     

Barapukuria Power Plant Unit 1 resumes power generation

Greenwatch Desk Energy 2026-08-15, 6:19pm

images109-5e98f059a2a7c49c1ee9ae53890104561786798924.jpg




Unit 1 of the Barapukuria Coal-Fired Thermal Power Plant in Dinajpur resumed electricity generation today, a day after it was shut down due to a mechanical fault.


The unit was restarted at 2.23pm on Saturday and has been supplying 55 megawatts (MW) of electricity to the national grid since then, said Abu Bakar Siddique, chief engineer of the Barapukuria Thermal Power Plant.

Following successful testing, the unit resumed full-scale generation, enabling electricity to be supplied to the national grid from around 2.30pm.

The 125MW-capacity Unit 1 had been supplying around 50MW to the national grid before it suddenly developed a mechanical fault on Friday morning, forcing the authorities to suspend generation.

Meanwhile, Unit 3 of the power plant remains operational. The 275MW-capacity unit is currently generating around 170MW and supplying it to the national grid.

Unit 2, however, has remained out of operation since 2020. Power plant authorities said initiatives have been taken to bring the unit back into service. They expressed hope that restarting Unit 2 would help ease the country's electricity shortage considerably.

With the resumption of Unit 1, electricity supplied to the national grid from the Barapukuria Thermal Power Plant has increased. Officials and engineers said the plant's overall power generation is expected to improve further in the coming days, reports BSS.